Zero Methane Slip
A closed-loop design returns removed impurities to the biogas plant, so no methane escapes with the CO₂ stream.

The Cold Jet CB 17 captures and liquefies the CO₂ from large biogas upgrading operations. It handles up to 850 Nm³/hr of off-gas and produces up to 3,710 lb (1,683 kg) per hour of food-grade liquid CO₂ — eliminating methane slip and unlocking new revenue.
Select Package
Documents
Large biomethane plants vent significant volumes of CO₂ that still carry residual methane. The CB 17 captures that off-gas directly after upgrading, purifies, compresses, liquefies, and distills it into high-purity liquid CO₂, and returns removed impurities to the plant. The result is zero methane slip, a lower CI score, and a steady supply of biogenic CO₂ to sell.
Standard capacity up to 1,683 kg/hr; platforms from 1,000 to 4,500 kg/hr are available on request.
Advanced CO₂ capture for the higher production capacities of larger biogas upgrading plants.

Interactive 3D
3D viewer coming soon
A closed-loop design returns removed impurities to the biogas plant, so no methane escapes with the CO₂ stream.
Liquefies up to 850 Nm³/hr of CO₂ gas from your upgrading off-gas into food-grade liquid CO₂.
Compression, cooling, liquefaction, and a final distillation step deliver a high CO₂ recovery rate and food-grade purity.
Sell high-purity biogenic liquid CO₂ into greenhouses, dry ice manufacturing, food and beverage, and emerging e-fuel markets.
Recovering methane and capturing CO₂ drastically reduces the carbon intensity score of your upgraded biogas.
A closed-loop liquefaction system uses natural CO₂ (R744) as refrigerant — no synthetic refrigerants.
Low energy consumption per ton of liquid CO₂, with an optional package that recovers energy set free during liquefaction.
Runs with minimal user intervention and easily handles variations in feed flow from the upgrading unit.
Containerized units install quickly with no extra building infrastructure and minimal changes to your site.
Oil-free piston reciprocating pumps lower maintenance costs.
The CB platform can be configured from 2,204 up to 9,920 lb (1,000–4,500 kg) per hour on request.
Includes client-side utilities, piping and electrical engineering support, preventive maintenance, and remote technical support.
Biogenic liquid CO₂ from your plant supplies established and emerging markets.

Biomethane plants vent the CO₂ separated during biogas upgrading, along with residual methane. Cold Jet CB systems capture that off-gas and purify, compress, and liquefy it into food-grade liquid CO₂, returning methane to the plant for zero methane slip and a lower CI score. The captured CO₂ becomes a new revenue stream, or feedstock for on-site dry ice.
Specs from the official CB 17 spec sheet. Use the toggle to switch between Imperial and Metric units.
| Specification | Imperial |
|---|---|
| Dimensions (L × W × H) | 40 × 28 × 14.3 ft |
| Weight | 44092 lb |
| Dry Ice Output | 3710 lb/h |
| Power Supply | 3 × 400 V AC (50 Hz) |
| Earthing System | TN-S |
The Cold Jet CB 17 can be tailored with six options. A CO₂ Emissions Reporting Package documents CO₂ captured and saved for ESG reporting, a gas dryer controls moisture before liquefaction, and an Energy Efficiency Package cuts plant energy use by about 10%. Capacity can be increased from 1,000 up to 4,500 kg/hr, a Dry Ice Production Hub adds on-site biogenic dry ice, and a maintenance plan covers preventive inspections.
Measures input and output flows to report CO₂ emissions captured and saved
CB 17Controls moisture / pressure dew point of CO₂ gas before liquefaction
CB 17Recovers energy set free during liquefaction — about 10% lower plant energy use
CB 17Platform configured from 1,000 up to 4,500 kg/hr on request
CB 17Add on-site dry ice production to sell biogenic dry ice
CB 17Preventive maintenance and inspections
CB 17* Contact Cold Jet for pricing and help sizing your recovery installation.
Cold Jet provides client-side utilities, piping, and electrical engineering support, preventive maintenance, and remote technical support — backed by more than 70 people in customer service and full spare parts inventory in every region, 24/7, 365 days a year.
Extended warranty programs and complete service agreement offerings are available for the CB 17.
Tell us your upgrading off-gas flow and biogas composition. Our engineers will size the CB system, support your utilities and piping, and help identify buyers for your CO₂.