The A. Raymond Group needed a better method for cleaning its plastic injection molds to reduce the downtime every 2 to 3 days from cleaning components. Harsh chemicals and ultrasonic baths were too slow and unsafe. Dry ice blasting increased process uptime by 25%, reduced cleaning time from 2-3 hours to less than 45 minutes, and consistently passes validation tests.

Dry Ice Blasting Cuts Downtime When Cleaning Injection Molds

Cleaning injection molds can cause a lot of unnecessary downtime in automotive production. Dry ice blasting is the rare alternative that can both reduce downtime and provide a thorough cleaning.

The A. Raymond Group is one of the leading development and production partners in the automotive industry. In addition to vehicles, the company supplies a quick fastening and connecting system for the solar, household article, aerospace, electronic and construction industries.

At the Lorrach facility, special fasteners and couplings for products are founded for injection molding. These include plug systems, screw parts and windscreen washer nozzles that are made out of polycarbonate, polyamide and POM, which are produced in three layer runners.

Cleaning the tools posed a number of problems:

  • Parts needed to be removed from the machine and disassembled so the small cavities could be cleaned with special tools, brushes and solvents.
  • The spool was cleaned in an ultrasonic bath.
  • The time required to disassemble, clean and reassemble the tools took several hours, causing significant downtime on the machine.
  • The abrasive tools and chemicals often damaged the machine parts.
“

Plastic contains flame retardants and additives that leave a coating in the cavities of the tools. This coating needs to be removed every two to three days to ensure that the quality of the parts will not be affected. The connector systems also need to go through multiple validation tests.

”
— Stefan Preller, Director of Manufacturing Industrialization (DMI)

A. Raymond Group Implements Dry Ice Blasting

In order to optimize their cleaning process, Preller researched dry ice cleaning as a possible solution.

The dry ice blasting process uses non-abrasive media in the form of recycled CO2 particles that won’t damage surfaces or equipment. The combination of dry ice cleaning’s kinetic energy and thermal effects break the connection between the dirt and surface, lifting away contaminants.

Unlike blasting with other media, dry ice blasting:

  • Does not leave any secondary waste
  • Is safe and non-toxic
  • Does not create downstream contamination

Learn more about how dry ice blasting works

Utilizing the traditional 3mm dry ice pellets to clean was unsuitable for A Raymond because the dry ice particles could not access the small cavities and contours of their tooling and molds. Preller then found out about MicroParticle sizes of dry ice.

MicroParticles are much finer and less aggressive than traditional pellets. They are also able to access hard to reach areas. MicroParticle machines require less compressed air to accelerate the smaller particles through the blast hose, so the machines are often quieter than pellet blasting machines.

Dry ice blasting improved A Raymond's operation

1. Increased process uptime by 25%

With a process that makes it virtually impossible to damage tools during cleaning, dry ice blasting has positively impacted process uptime by 25%. Machines are up and running more efficiently than when other cleaning methods were used.

2. Reduced downtime for cleaning from 2 to 3 hours to only 45 minutes

Mobile and compact, the dry ice blasting system is driven to the relevant injection mold, connected to a compressed air supply and static ground cable, and the molds are cleaned with the appropriate nozzle. This process takes no more than 45 minutes.

3. Consistently passes validation tests

Effective cleaning ensures that the vent of the injection mold is always optimal; therefore, validation tests of connector systems no longer fail.

4. User-friendly operation

The machine is also simple to operate:

“

I taught the staff how to operate the dry ice blasting system in less than 20 minutes. Previously, a specially trained staff was required for tool cleaning and now it can be done easily by anyone. This is a significant advantage on the weekend, especially during the continuous shift system.

”
— Stefan Preller, Director of Manufacturing Industrialization (DMI)

5. Environmentally friendly and worker safe

On top of these other improvements, dry ice blasting uses media that is environmentally friendly and eliminates the need for employees to come into contact with harmful chemicals, resulting in a much safer work environment.

At A. Raymond in Lorrach, three dry ice blasting systems are in use. Two of them are used for tool cleaning every two days. The third system is used in the Technical Plastic Maintenance department to clean injection molds.

“

Due to the time savings, we were able to increase machine utilization significantly and the machine paid for itself in less than one year. Because of the savings in both time and costs, I am sure these systems will be used at other plants. They allow for a significant increase in process reliability and have helped us to maintain our high quality standards.

”
— Stefan Preller, Director of Manufacturing Industrialization (DMI)

Learn about dry ice blasting for plastics

automotive-injection-mold-before-dry-ice-blasting
Before dry ice blasting
automotive injection mold after dry ice blasting
After dry ice blasting

Key Takeaways

  • The A. Raymond Group needed a more expedient method for cleaning its plastic injection molds to reduce the hours-long downtime every 2 to 3 days
  • The molding equipment needed to be disassembled and cleaned with different slower methods, including an ultrasonic bath and solvents with brushes for smaller mold cavities
  • After implementing dry ice blasting, cleaning process uptime increased 25%, cut cleaning time from 2-3 hours to 45 minutes, and increased validation test passing